Pipe test equipment for gas- and water supply pipes  Basics The pipe tester ZLP1 work with pressure drop measuring in gas- or water supply pipes, so that after a new installation of the pipes, produce a document for the tightness of there. The pipe tester ZLP1 is package in a transportable case and consist of a measuring- and display-modul, a mechanicle connection box, external pressure sensors and accessories.
Measuring modul - microcontroller: ZILA-10
- display: LCD 2-lines, 16-characters
- keyboard: 4 keys
- power supply: 5VDC plug-in power supply
Mechanics / Sensors
- needle valve
- lock valve
- pressure sensor 1: LOW 0..250 mbar (pluggable)
- pressure sensor 2: HiGH 0..20 bar (pluggable)
Software
- measuring cycle: 1 Sec.
- display cycle: 1 Sec.
- pressure- and temperature-difference calculation
- additional function: zero-point calibration
Scope of supply
- case with measuring modul
- 2 pressure sensors
- 1 sensor cable
- plug-in power supply
- hand-pump
- connection tube
- manual
|